Bump golang.org/x/crypto from 0.14.0 to 0.17.0 in /provider #208
preprod-deployment.yml
on: push
Matrix: π Build and upload provider
Annotations
5 errors
π Build and upload provider (darwin)
Process completed with exit code 1.
|
π Build and upload provider (windows)
The job was canceled because "darwin" failed.
|
π Build and upload provider (windows)
Process completed with exit code 1.
|
π Build and upload provider (linux)
The job was canceled because "darwin" failed.
|
π Build and upload provider (linux)
Process completed with exit code 1.
|