Notifications
You must be signed in to change notification settings - Fork 46
Commit
This commit does not belong to any branch on this repository, and may belong to a fork outside of the repository.
Co-authored-by: James McKinney <[email protected]>
- Loading branch information
1 parent
e9a8019
commit e9dfad7
Showing
2 changed files
with
4 additions
and
4 deletions.
There are no files selected for viewing
This file contains bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Original file line number | Diff line number | Diff line change |
---|---|---|
@@ -1,5 +1,5 @@ | ||
Code,Title,Description,Deprecated,Deprecation note | ||
pending,Pending,"The award was made and the standstill period, if any, has ended. The contract is not yet concluded (for example, not signed by all parties).",1.2,Deprecated because the same information can be determined by the absence of `contracts.dateSigned`. | ||
active,Active,"The contract was concluded (for example, signed by all parties). The contract is not yet terminated.",1.2,Deprecated because the same information can be determined by comparing `contracts.period` to `date`. | ||
active,Active,"The contract was concluded (for example, signed by all parties). The contract is not yet terminated.",1.2,Deprecated because the same information can be determined by the presence of `contracts.dateSigned` and by comparing `contracts.period` to `date`. | ||
terminated,Terminated,"The contract was concluded (for example, signed), and has now come to a close. This might be due to the successful completion of the contract, or might be early termination due to some non-completion.",1.2,OCDS 1.2 replaces this code with a new field for final states. | ||
cancelled,Cancelled,"The contracting process was cancelled by the buyer or the procuring entity (e.g. because of a change in needs, insufficient funds, or technical or procedural errors) after the award was made and the standstill period, if any, had ended.",1.2,OCDS 1.2 replaces this code with a new field for final states. |
This file contains bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Original file line number | Diff line number | Diff line change |
---|---|---|
@@ -1,8 +1,8 @@ | ||
Code,Title,Description,Deprecated,Deprecation note | ||
planning,Planning,"A future contracting process is being considered. Early information about the process can be provided in the tender section. A process with this status might provide information on early engagement or consultation opportunities, during which the details of a subsequent tender can be shaped.",1.2,"Deprecated as unnecessary, since contracting processes are separate from planning processes (which do not have any states)." | ||
planned,Planned,"The contracting process is scheduled, but contracting documents (for example, procurement documents) are not yet available to potential suppliers.",1.2,Deprecated because the same information can be determined by the absence of `tender.datePublished` (new in 1.2). | ||
active,Active,"The contracting documents (for example, procurement documents) are available to potential suppliers, and the bid submission deadline has not yet passed.",1.2,Deprecated because the same information can be determined by comparing `tender.datePublished` (new in 1.2) and `tender/tenderPeriod/endDate` to `date`. | ||
complete,Complete,The bid submission deadline has passed.,1.2,Deprecated because the same information can be determined by comparing `tender.tenderPeriod.endDate` to `date`. | ||
active,Active,"The contracting documents (for example, procurement documents) are available to potential suppliers, and the bid submission deadline has not yet passed.",1.2,Deprecated because the same information can be determined by the presence of `tender.datePublished` (new in 1.2) and by comparing `tender/tenderPeriod/endDate` to `date`. | ||
complete,Complete,The bid submission deadline has passed.,1.2,Deprecated because the same information can be determined by the presence of `tender.datePublished` (new in 1.2) and by comparing `tender.tenderPeriod.endDate` to `date`. | ||
cancelled,Cancelled,"The contracting process was cancelled by the buyer or the procuring entity (for example, because of a change in needs, insufficient funds, or technical or procedural errors) after the contracting documents (for example, procurement documents) were available to potential suppliers, but not later than the bid submission deadline.",1.2,OCDS 1.2 replaces this code with a new field for final states. | ||
unsuccessful,Unsuccessful,"The contracting process failed (for example, no bids were received, all bids were withdrawn by the bidders, all bids were rejected by the buyer or the procuring entity) after the contracting documents (for example, procurement documents) were available to potential suppliers, but not later than the bid submission deadline.",1.2,OCDS 1.2 replaces this code with a new field for final states. | ||
withdrawn,Withdrawn,No further information on the contracting process is available under this ocid.,1.2,OCDS 1.2 replaces this code with a new field for final states. | ||
withdrawn,Withdrawn,No further information on the contracting process is available under this ocid.,1.2,This code is deprecated, because it describes the status of the publication, not of the contracting process. |