-
Notifications
You must be signed in to change notification settings - Fork 5
scenarios
Tom Russell edited this page Feb 11, 2019
·
1 revision
Most of the sector models take as inputs infrastructure service demands (an exception being the energy_supply model which takes final energy demand as an input.
In most cases, infrastructure service demands are derived from scenario data, in a separate pre-processing workflow to the simulation of the operation of the systems.
Labels:
- nismod2
- scenarios
ITRC scenarios for NISMOD2/smif models:
- reformat from database tables
- downscale GVA to LAD (Assuming constant regional productivity (productivity = GVA/employment), LAD sectoral GVA is LAD sectoral employment x regional sectoral productivity.)