Skip to content

chore(deps): update devdeps #2971

chore(deps): update devdeps

chore(deps): update devdeps #2971

Triggered via pull request October 21, 2024 18:55
Status Failure
Total duration 5m 14s
Artifacts

build-and-test-on-pr.yml

on: pull_request
Matrix: test-integration
report-coverage
0s
report-coverage
Fit to window
Zoom out
Zoom in

Annotations

9 errors
test-integration (5)
Process completed with exit code 1.
test-integration (3)
The job was canceled because "_5" failed.
test-integration (3)
The operation was canceled.
test-integration (1)
The job was canceled because "_5" failed.
test-integration (1)
The operation was canceled.
test-integration (4)
The job was canceled because "_5" failed.
test-integration (4)
The operation was canceled.
test-integration (2)
The job was canceled because "_5" failed.
test-integration (2)
The operation was canceled.