Add timing point constraints and tests #1146
cd.yml
on: pull_request
Build & Push docker image to Docker Hub
57s
run_dump_tests
/
Check if the generated dumps are up to date
5m 55s
Run e2e tests
11m 18s
Matrix: Run hasura integration tests
Matrix: Run migration tests
Annotations
3 errors and 1 warning
Run migration tests (generic-)
Process completed with exit code 1.
|
Run migration tests (hsl-)
The operation was canceled.
|
run_dump_tests / Check if the generated dumps are up to date
Process completed with exit code 1.
|
Run e2e tests
No files were found with the provided path: /home/runner/work/jore4-hasura/jore4-hasura/cypress/reports. No artifacts will be uploaded.
|