You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
With the Status 10K MVP reaching feature-completeness, dogfooding of statically-sharded communities, with all the features designed around scalability of this model, must start in earnest. The suggestion is to start with a single Test Community, followed by a Status CC Community and then one for each of the existing Logos teams/communities (Vac, Waku, Codex, Nomos, etc.). Features such as Media Shards, Control Message sharding, etc. must be implemented and tested fully during this period.
Acceptance Criteria
Tasks
RAID (Risks, Assumptions, Issues and Dependencies)
The text was updated successfully, but these errors were encountered:
Planned start date:
Due date: 31 Aug 2023
Summary
With the Status 10K MVP reaching feature-completeness, dogfooding of statically-sharded communities, with all the features designed around scalability of this model, must start in earnest. The suggestion is to start with a single Test Community, followed by a Status CC Community and then one for each of the existing Logos teams/communities (Vac, Waku, Codex, Nomos, etc.). Features such as Media Shards, Control Message sharding, etc. must be implemented and tested fully during this period.
Acceptance Criteria
Tasks
RAID (Risks, Assumptions, Issues and Dependencies)
The text was updated successfully, but these errors were encountered: