You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
This repository has been archived by the owner on Aug 30, 2024. It is now read-only.
Add multiple backend gateway tests which validate the system during negative tests.
Negative:
Up/down test of GWs repeated at random intervals during packet streaming.
Repeated adding removing of GWs during packet streaming
Test GW teardown and recovery during high VM count (ie 500+ VMs) and basic/small packet test(ping?)
Long term burn in of multiple GWs during VM churn tests
The text was updated successfully, but these errors were encountered:
Add multiple backend gateway tests which validate the system during negative tests.
Negative:
Up/down test of GWs repeated at random intervals during packet streaming.
Repeated adding removing of GWs during packet streaming
Test GW teardown and recovery during high VM count (ie 500+ VMs) and basic/small packet test(ping?)
Long term burn in of multiple GWs during VM churn tests
The text was updated successfully, but these errors were encountered: